|
dev
newsgroups
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
Disable a job scheduleHi,
I have a job with three steps and four schedule time per day. I schedule a job to disable one of schedule time, such as 5:00PM schedule. The job is still enable, but this schedule time show enabled =NO before 5:00PM. However, the 5:00PM schedule still run regardless schedule enabled=NO. Is this flag in sysjobschedules play any role for enable and disable a schedule? Or, I have to disable and enable from the job level (sysjobs). Please advise. -- Best Regards, Lynn Hmm, I disable job in the job level (sysjobs) at 4:45PM and the 5:00PM
schedule is enabled. And, the job still run at 5:00PM even though the job is disabled. I don't understand what's wrong in my procedure. From the Enterprise Manager, I see the job was disabled. Looks like either way (from job level or schedule level) won't work. Please help. -- Show quoteBest Regards, Lynn "Lynn" wrote: > Hi, > > I have a job with three steps and four schedule time per day. > > I schedule a job to disable one of schedule time, such as 5:00PM schedule. > The job is still enable, but this schedule time show enabled =NO before > 5:00PM. However, the 5:00PM schedule still run regardless schedule > enabled=NO. > > Is this flag in sysjobschedules play any role for enable and disable a > schedule? Or, I have to disable and enable from the job level (sysjobs). > Please advise. > > -- > Best Regards, > > Lynn |
|||||||||||||||||||||||