I have a job with three steps and four schedule time per day. 

I schedule a job to disable one of schedule time, such as 5:00PM schedule. 
The job is still enable, but this schedule time show enabled =NO before
5:00PM.  However, the 5:00PM schedule still run regardless schedule
enabled=NO. 

Is this flag in sysjobschedules play any role for enable and disable a
schedule?  Or, I have to disable and enable from the job level (sysjobs). 
Please advise.

--
Best Regards,

Lynn

Author
13 Dec 2005 1:33 AM
Lynn
Hmm,  I disable job in the job level (sysjobs) at 4:45PM and the 5:00PM
schedule is enabled.  And, the job still run at 5:00PM even though the job is
disabled.  I don't understand what's wrong in my procedure.  From the
Enterprise Manager, I see the job was disabled. 

Looks like either way (from job level or schedule level) won't work.

Please help.
--
Best Regards,

Lynn


Show quote
"Lynn" wrote:

> Hi,
>
> I have a job with three steps and four schedule time per day. 
>
> I schedule a job to disable one of schedule time, such as 5:00PM schedule. 
> The job is still enable, but this schedule time show enabled =NO before
> 5:00PM.  However, the 5:00PM schedule still run regardless schedule
> enabled=NO. 
>
> Is this flag in sysjobschedules play any role for enable and disable a
> schedule?  Or, I have to disable and enable from the job level (sysjobs). 
> Please advise.

> --