|
dev
newsgroups
|
|||||||||||||||||||||||
|
|||||||||||||||||||||||
Add existing database to a ProjectI have an existing database with many procedures that has been managed ad hoc
in the past. I would like now with SSMS to move the database into a project with an alter script for each object and maintain the project in source control. Does anyone know a simple way to acheive this rather than manually scripting each object? Is there a better way of doing this? Thanks for your suggestions. "David" wrote: Hi,> I have an existing database with many procedures that has been managed ad hoc > in the past. I would like now with SSMS to move the database into a project > with an alter script for each object and maintain the project in source > control. > > Does anyone know a simple way to acheive this rather than manually scripting > each object? > > Is there a better way of doing this? > > Thanks for your suggestions. I have the same problem with a really big existing database, with many stored procedures. So I'm very interested in a solution for this too. Did you get any suggestions so far? Markus (Germany) |
|||||||||||||||||||||||